The symptom
The little box window over the sink is cold and leaking, or I want a sunny shelf for plants and herbs.
The proposed method
Ask for the selected garden-window dimensions, support arrangement and shelf configuration to be confirmed for the opening. Have the provider explain the proposed treatment of the top, sides and sill, and identify interior and exterior finishing work. Confirm which existing elements will remain and how any additional opening repair would be documented.
Items to discuss
garden window unit, glass shelf, support brackets, head flashing, sill flashing, sealant, interior trim. Clarify which parts or materials would be supplied, which tools would be used, and what documentation is included.
Property context in Miami Beach
Miami-Dade County's building department publishes separate permit checklists for replacement windows, glass doors, exterior doors and shutters. Each one asks for a completed building permit application, a frontal elevation of the exterior wall showing where the products go together with their product approval numbers, and the current Notice of Acceptance of each window, glass door, door or mullion used. The county also states that each municipality in Miami-Dade has its own building official who issues permits within that city limits. Confirm the address, the proposed scope and the applicable review with the City of Miami Beach. The checklists describe what a department asks for; they do not decide whether a particular product or opening qualifies at your property.
Source for planning your work ↗The City of Miami Beach building department publishes a windows and doors inspections notice which states that exterior windows and doors installation always requires a building permit, with inspections for flashing and anchorage and a special inspector form for buck and anchor unless the notice's stated alternative conditions are met. For replacement work in existing buildings the notice says the contractor must call in-progress inspections on the first and every following day of removal and installation work. Ask your contractor how those inspections will be scheduled. The notice carries a revision date, so confirm the current version with the city.
Source for local context ↗Area-wide context is not a finding about your own property.
What shapes the quote?
The component being changed
Glass-only, hardware-only and complete-frame work involve different materials and labor. Compare proposals for the same work.
Access and concealed condition
Opening size, access, finishes and damage discovered during removal can change the work. Agree how any change will be documented.
The complete proposal
Clarify removal, disposal, weatherproofing, finish restoration and completion checks before comparing totals.
Ask for a written quote and confirm the complete charge before work begins.